ADI structured and led a workshop examining how AI‑driven data center growth translates into power demand, infrastructure strain, and planning risk. Insights were synthesized from utilities, hyperscalers, OEMs, and developers to assess demand magnitude, geographic concentration, and timing relative to transmission and permitting constraints. The analysis framed implications for fuel mix, grid investment sequencing, and regulatory engagement under multiple AI adoption scenarios.

Global integrated energy company

Accelerating AI adoption is driving uncertain but potentially outsized data‑center power demand amid grid and permitting constraints.

Contribution icon 1

Drew on ADI’s established relationships with utilities, OEMs, developers, and academics for candid, cross‑sector perspectives.

Contribution icon 2

Evaluated transmission, interconnection, and permitting bottlenecks shaping feasible data‑center expansion timelines.

Contribution icon 3

Assessed viability of gas, renewables, nuclear, storage, and flexibility solutions against hyperscaler requirements.

Contribution icon 4

Translated expert insights into actionable implications for long‑term infrastructure and energy planning.

  • Established decision context for grid investment, fuel mix, and policy engagement under structurally rising but uncertain AI‑related power demand.
Client Results
ADI helped us quantify our target market size in a very methodical manner. They got up to speed very quickly on what we do, spending time with our team, technology, and markets to perform a thorough evaluation themselves.
Doug Moorehead President, FlexGen Power Systems

Industry experience

Data center electricity outlook and pricing

ADI built a bottom‑up view of U.S. data center electricity demand driven by AI workloads, using rack density, GPU power consumption, utilization assumptions, and load growth scenarios. These demand estimates were stress‑tested through interviews with utilities, hyperscalers, and power developers to assess grid constraints and timing mismatches. The work linked physical load growth to regional […]

More insights

Article Icon Article

Europe’s eSAF ambitions face a widening supply gap

The European Union’s ReFuelEU Aviation regulation required sustainable aviation fuel (SAF) to account for at least 2% of aviation fuel supplied at EU airports in 2025. The target was exceeded, with SAF accounting for 2.79% of total aviation fuel supplied during the year. However, almost all of this SAF came from bio-based pathways, such as […]

Premium content Icon Premium content

Supply chains will decide how fast energy’s capital projects get built

North America is building more energy infrastructure than at any time in decades. New power plants, transmission lines, pipelines, LNG terminals and oil and gas facilities are under construction at the same time, and they draw on the same equipment makers, contractors and skilled crews. Supply chains will decide which of these projects finish on […]