ADI independently assessed engineered geothermal system economics using expert elicitation and lifecycle cost modeling. Drilling depth, well productivity, stimulation costs, and surface plant design were treated explicitly to capture uncertainty ranges in LCOE outcomes. Results highlighted where cost reduction efforts would have the greatest impact on commercial viability.
The client
U.S. Department of Energy
The situation
High cost uncertainty hindered EGS commercialization.
ADI’s contributions
Expert cost elicitations
Gathered drilling and reservoir cost ranges.
Proprietary LCOE modeling
Applied GETEM‑based lifecycle models.
Uncertainty analysis
Modeled cost distributions and sensitivities.
Technology benchmarking
Benchmarked EGS against other power options.
Key outcomes
- Quantified cost drivers and uncertainty bands to guide R&D focus.
More insights
2026 May SAF Tracker highlights – #86
Here are the latest highlights from ADI’s SAF Tracker: The full newsletter along with archives and databases are available to SAF Tracker subscribers.
Newsletter: Data center power, ammonia, and biofuel mandates
In the June 2026 edition, AI-driven demand is surging, but constraints in grid capacity, permitting, and equipment supply are reshaping how and where data centers expand. Developers are increasingly embedding power considerations into site selection, shifting toward distributed infrastructure models and prioritizing regions with faster, more reliable access to electricity. As power availability becomes a […]
The growing challenge of industrial R&D
For much of the 20th century, R&D was viewed as a long-term investment in scientific discovery, often insulated from day-to-day operational pressures. Success was measured in patents, breakthrough technologies, and the promise of future growth. Today, that view no longer holds. Across energy, chemicals, and broader industrial sectors, R&D has been reshaped by a combination […]